Eden Isles
Most lots here carry a deck, a dock and often a boathouse and rails, and all of the waterside structures come due well before the house does. They get measured and priced on their own line.
Home › Services › Deck and Fence Staining › Slidell
Slidell is where deck and dock work earns its own line on the estimate instead of being folded into an exterior job.
The job here
Slidell is where deck and dock work earns its own line on the estimate instead of being folded into an exterior job. In Eden Isles and Oak Harbor a great many properties carry a deck, a dock, a boathouse and rails, and all of those take more sun and far more wetting than the house behind them.

They therefore come due on a much shorter clock. It is not unusual for the waterside structures on a lot to need attention while the walls of the house have years left in them, which is why we measure and price them separately.
The start is decided by moisture content, not the calendar. Timber that is still holding water will not take a stain: it sits on the surface and lifts. On a canal lot, where the air itself is damp for much of the year, that wait is longer than it would be inland and we check instead of assuming.
None of this is a salt problem. The canals run to Lake Pontchartrain, which is brackish, not salt water, so marine coatings are not the answer here and paying for one is paying for a specification the conditions do not call for. Preparation and the right ordinary product do more.
On stain against paint, stain wins on decking almost every time here. It penetrates the timber and wears away gradually, so a recoat three or four years down the line is a wash and a fresh coat, not a project, whereas paint on a horizontal waterside surface peels when it goes and then has to be stripped back to bare wood before anything else can happen at all. That is a weekend against a fortnight.
On the ground
Most lots here carry a deck, a dock and often a boathouse and rails, and all of the waterside structures come due well before the house does. They get measured and priced on their own line.
Much of it built on water, so timber stays damp longer and the wait for a dry surface is longer than inland. Stain over damp wood sits on the surface and lifts, which on a horizontal board shows fast.
Why the quote says two
Painting a house here is a different job from painting one in a dry climate. Humidity changes how long a coat stays open, and it decides how much film you need on a wall before the weather starts taking it back.

First coat
The first coat is doing a different job from the second. It bonds to what is underneath and it tells us where the substrate is still drinking, which is information you only get once paint is actually on the wall.

Second coat
The second coat is where the color goes true and the film reaches the thickness printed on the tin. One coat over a sound wall looks fine from the driveway and looks thin on the north side by spring.
How it runs
The same three on every job in Slidell, whatever the trade.
Book your free consultation by phone or through the form. Ask for references at any time.
You get a project schedule and an accurate quote, whatever the size of the job.
Your painter starts, keeps you updated, and tidies up when the job is done.
2,500
Jobs finished
12
Cities covered
2
Coats quoted as standard
$0
Cost of an estimate
Questions we get asked
The first two are about deck and fence staining in Slidell. The rest come up on almost every estimate.
Not answered here?
Ask it on the estimate call. No charge, no obligation.
Mon to Fri, 8:00 AM to 6:00 PM. Sat and Sun closed.
View more FAQsOften yes, since the crew is already there, but they are priced separately because they do not come due together. The dock will usually need attention first.
No. The water is brackish, not salt, so this is a moisture and mildew problem. Preparation and the right ordinary product do more than a marine coating would.
Yes. For most projects our paint specialists can match almost any color on your home from a chip or a wet sample. If an exact match is not possible we will talk you through the next best option.
It varies by material and exposure. Stucco every 5 to 6 years. Painted brick 15 to 20 years. Aluminum siding every 5 to 6 years. A wall that takes afternoon sun will always come due first.
No. Our team covers and protects furniture and floors. If a piece is delicate or awkward to move, it is worth taking it out of the room beforehand.
Yes. Every estimate is written for two coats over prepared surface, and the number you get is the number for the finished job. If a surface genuinely only needs one, we say so and the quote comes down instead of staying where it was.
Nearby and next door
Every link below is a real page, not a filter. Pick the trade or the town you actually want.
Not sure which? Call 504-226-6252 and we will tell you.
Other trades in Slidell
4Deck and Fence Staining elsewhere
5Either way
Whether you have a small interior project or a large-scale exterior makeover in mind, Big Easy Paintings is your partner for the work. Talk to us about the project, get a quote, and we will tell you plainly what it takes.
Free estimate
On site or remote, in all twelve towns. No charge and no obligation. If it is quicker to talk, call 504-226-6252 and we will pick up.
Or call 504-226-6252
No range, no surprise second visit to finish what one coat could not.