Rivertown
The historic district by the levee. Older wood, deeper eaves, and trim profiles that take hand work instead of a spray gun.
Home › Service Areas › Kenner
Levee to lakefront, and those two ends do not dry at the same rate. Free estimates on site or remote, and every quote is written for two coats.
What changes here
Kenner runs from the Mississippi levee at Rivertown north to the Lake Pontchartrain shoreline, and those two ends of town do not dry at the same rate.
On the water
A canal, a levee or a lakefront behind the house holds humidity at ground level. Two ends of one street can be ready to coat at different hours, so the order of the day matters more than the size of the crew.

On the ground
Most of our Kenner work sits in four pockets, and each one asks for something different.
The historic district by the levee. Older wood, deeper eaves, and trim profiles that take hand work instead of a spray gun.
The north end of this one reaches Lake Pontchartrain. Overnight moisture off the water is the thing that decides the start time here.
Mid-century brick and siding mixes, where the siding and the trim are usually on completely different repaint clocks.
Compact lots and close-set houses, so shaded elevations stay damp longer into the morning than the sunny side does.
Conditions
Four things that change the work here, and what each one means for the schedule and the price.
Lake Pontchartrain is brackish, not salt, so nothing on this side of Kenner is fighting corrosion whatever the damage looks like. It is moisture. Overnight humidity coming off the water holds long enough that on some mornings the genuinely usable coating window is two or three hours shorter than the forecast for the day would lead you to expect.
Least sun, most moisture. That elevation is where film failure turns up first, every time, and it is a prep and product question, not a pressure washing one.
Hurricane season runs June 1 to November 30. Exterior work planned for that stretch gets sequenced so that no elevation is ever left open and uncoated while something is being watched out in the Gulf.
A Kenner house often carries stucco, painted brick and aluminum siding at once. Those do not come due together.
What we run here
Interior and exterior, in all twelve. Inside walls and outside surfaces run out of the same shop, so the crew that quotes your kitchen is the crew that quotes your siding.
On the houses people live in

One room or the whole house, with floors and furniture covered before the first can opens.
Interior Home Painting in Kenner
Curb appeal is the reason people call. Weather protection is the reason it matters here.
Exterior Home Painting in Kenner
A new kitchen look without replacing a single door. We degrease, sand and spray for a finish that survives daily use.
Cabinet Painting in Kenner
Paint, cabinet upgrades and the finish work that ties the two together.
See the service
Stains and coatings picked for wood that sits in full sun and heavy rain, so the boards stop drinking water.
Deck Staining and Painting in Kenner
Dirt, grime and mildew come off before any paint goes on. It is also a service on its own, for storefronts, walkways and parking structures cleaned on a set schedule.
See the service
Hanging new paper, or stripping old paper and priming the wall flat before it takes paint.
See the serviceUnsure about the right palette? Our team can help you choose.
See the serviceOn the buildings they run

Color matched to your brand and scheduled around the working day.
Office Painting in Kenner
Non toxic, hard wearing coatings for classrooms and corridors, scheduled around the term.
School Painting in Kenner
Hospital grade coatings that clean easily and survive repeated wipe downs.
Hospital Painting in Kenner
Durable color that holds up to humidity, equipment and constant foot traffic.
Gym Painting in KennerWhy the quote says two
Painting a house here is a different job from painting one in a dry climate. Humidity changes how long a coat stays open, and it decides how much film you need on a wall before the weather starts taking it back.

First coat
The first coat is doing a different job from the second. It bonds to what is underneath and it tells us where the substrate is still drinking, which is information you only get once paint is actually on the wall.

Second coat
The second coat is where the color goes true and the film reaches the thickness printed on the tin. One coat over a sound wall looks fine from the driveway and looks thin on the north side by spring.
How a job runs
The same three whether the job is a bedroom in Kenner or a whole building.
Book your free consultation by phone or through the form. Ask for references at any time.
You get a project schedule and an accurate quote, whatever the size of the job.
Your painter starts, keeps you updated, and tidies up when the job is done.
2,500
Jobs finished
12
Cities covered
2
Coats quoted as standard
$0
Cost of an estimate
Questions we get asked
The first four are about Kenner itself. The rest come up on almost every estimate, wherever the job is.
Not answered here?
Ask it on the estimate call. No charge, no obligation.
Mon to Fri, 8:00 AM to 6:00 PM. Sat and Sun closed.
View more FAQsLate autumn through spring. The dew point sits lower then, so surfaces clear the margin earlier in the day and the workable window is at its widest. Summer is perfectly workable too, it simply means earlier starts and more days where we prep in the morning and coat in the afternoon once the wall has come up to temperature.
It depends what the surface is. Stucco and aluminum siding come around every 5 to 6 years. Painted brick holds 15 to 20. A house carrying more than one of those needs a plan per surface, not a single repaint date for the whole building.
Yes. Older stock near the levee usually needs hand scraping, spot priming and brush work on the trim profiles, all of which takes considerably longer than a newer subdivision house and all of which the estimate says out loud before you agree to anything.
Less sun means the surface stays damp for longer after every rain and every humid night, and a paint film that never fully dries out is the one that lets mildew in behind it. So we treat that elevation as its own job.
Yes. For most projects our paint specialists can match almost any color on your home from a chip or a wet sample. If an exact match is not possible we will talk you through the next best option.
It varies by material and exposure. Stucco every 5 to 6 years. Painted brick 15 to 20 years. Aluminum siding every 5 to 6 years. A wall that takes afternoon sun will always come due first.
No. Our team covers and protects furniture and floors. If a piece is delicate or awkward to move, it is worth taking it out of the room beforehand.
Yes. Every estimate is written for two coats over prepared surface, and the number you get is the number for the finished job. If a surface genuinely only needs one, we say so and the quote comes down instead of staying where it was.
Nearby
We cover the New Orleans metro, the north shore and up the river as far as Baton Rouge. If your street is not on the list, call and ask.
See every townOn the water, like Kenner
Everywhere else we cover
Either way
Whether you have a small interior project or a large-scale exterior makeover in mind, Big Easy Paintings is your partner for the work. Talk to us about the project, get a quote, and we will tell you plainly what it takes.
Free estimate
On site or remote, in all twelve towns. No charge and no obligation. If it is quicker to talk, call 504-226-6252 and we will pick up.
Or call 504-226-6252
No range, no surprise second visit to finish what one coat could not.