
First coat
Bond and coverage
The first coat is doing a different job from the second. It bonds to what is underneath and it tells us where the substrate is still drinking, which is information you only get once paint is actually on the wall.
What this covers
A refinished kitchen reads as new for a fraction of a renovation, and it lives or dies on two things nobody sees: how well the doors were degreased, and whether the finish was given real time to cure between coats.

How cabinets are done
It is removal, numbering, degreasing, sanding, priming, thin coats, cure time and refitting. The paint is a small part of the hours, which is why cabinet work costs more per square foot than a wall does.
The hardware comes off with them. Painting around a hinge is the most obvious shortcut in this trade and it shows on every door for the life of the finish.
A kitchen deposits cooking oil on everything within reach of the hob for as long as the kitchen has existed, and no primer made will stick through that. This is the step a cheap quote drops, and it is why cheap cabinet work peels at the edges inside a year.
Thin coats. Cabinets that are rushed stay soft for weeks, and soft finish plus daily handling means chipped edges by the spring.
A Gulf South summer slows curing noticeably, so a job quoted honestly in July has more days in it than the same job in November. We would say that up front before handing a kitchen back before it is hard.
You lose the use of the cupboards for the run of the job, not the kitchen itself.

Why the quote says two
Painting a house here is a different job from painting one in a dry climate. Humidity changes how long a coat stays open, and it decides how much film you need on a wall before the weather starts taking it back.

First coat
The first coat is doing a different job from the second. It bonds to what is underneath and it tells us where the substrate is still drinking, which is information you only get once paint is actually on the wall.

Second coat
The second coat is where the color goes true and the film reaches the thickness printed on the tin. One coat over a sound wall looks fine from the driveway and looks thin on the north side by spring.